Asset Integrity Management Services

Risk Based Inspection (RBI)

ScanInspect has a team of certified level 2 & 3 inspectors as per ISO and ASNT (ACCP / SNT-TC-1A) standards. Use of calibrated devices as per ASTM or ISO, and certified consumables.

  • Initial Risk Assessment & Inspection Planning
  • RBI Evergreening/ Reassessment
  • RBI Validation
  • API-580
  • API-581
  • Pressure Vessels
  • PSVs
  • Storage Tanks
  • Piping

Fitness for service & remaining life assessment (FFS & RLA)

  • Fitness For Service & Remaining Life Assessment
  • Condition Assessment
  • Life Extension Studies
  • Assessment Levels I, II & III
  • Alteration, Re-rating & Repair Recommendations
  • API-579-1/ASME FF-1 
  • BS7910 
  • ASME B 31G
  • Pressure Vessels
  • Boilers
  • Storage Tanks
  • Piping
  • Brittle Fracture
  • General Metal Loss
  • Local Metal Loss
  • Pitting Corrosion
  • Blisters, HIC, SOHIC Damage
  • Weld Misalignment and Shell Distortions
  • Crack Like Flaws
  • High Temperature Operation & Creep
  • Fire Damage
  • Dent, Gouges and Dent-gouge Combinations
  • Laminations
  • EEC Plant Engineer
  • ANSYS
  • ABAQUS
  • PVELITE
  • SIGNAL
  • AUTO PIPE
  • CAESER
  • MECASTACK

Corrosion Management Plans (CMP) & Corrosion Risk Assessment (CRA)

  • CM Policy, Strategies & Objectives
  • Manuals & Procedures
  • Organizational Structure & KPIs
  • DMs, Looping & Risk Assessment (CRA)
  • Inspection & Management Plans/Strategies
  • Performance Reviews & Measurement
  • Management of Change Procedures
  • Corrosion Modelling
  • Material Selection Validation (MCA)
  • Integrity Operating Windows (IOWs)
  • ECE
  • Predict
  • Orksoft
  • Palladio
  • API-RBI

Pipeline Integrity Management (PIMS)

  • Provision of PIMS Electronic System
  • Development of Pipeline Corporate Integrity Standards, Procedures  & Guidelines
  • 3rd Party Audits for Compliance Check – Existing PIMS
  • Technical support to Conduct Integrity Assessment
  • Remnant Life Extension Studies for aging pipelines
  • API-1160
  • ASME B31.8S
  • DNV RP F116
  • Palladio

Integrity operating Windows (IOW)

Established limits for process variables that can affect the integrity of the asset if the process operation deviates from the established limits for a predetermined length of time. 

  • Future Inspection Plans – based on prior/recorded inspection history of assets
  • Unexpected failures due process variables change
  • Inspection plans should be dynamic and account for changing process conditions and current asset condition

IOWs Program (API-584, 571, NACE, BIPs)

  • Identification of damage drivers & key process variables impact the deterioration/ degradation rate and accordingly Risk
  • Helps to avoid unexpected or unplanned deterioration or damage to asset which may result in a loss of containment.

Root Cause Failure Analysis (Rcfa)

Root Cause Failure Analysis

  • Corrosion & Cracking Failures
  • Creep & Fatigue Failures
  • Wear Failures
  • Operational Failures

Testing & Review Scope

  • Destructive & Non-Destructive Testing
  • Visual & Dimensional Inspection
  • Micro-Macro Examination
  • SEM/ EDS Analysis
  • Chemical Analysis
  • Tensile, Impact, Hardness Testing
  • Microbiological Testing
  • Process, Design, Metallurgical Reviews
  • RCFA Report
  • Lab & Inspection-Testing Reports

ScanInspect International Services

Inspection, Compliance, Verification & Assurance